Skip to content
1300 448 608
Platinum Signs

Platinum Signs

In the Event of Fire Do Not Use Lift Sign

PSS-WH-GEN-0055 · Product data sheet

Data sheet

26 August 2026

https://www.platinumsigns.com.au

In the Event of Fire Do Not Use Lift Sign

Description

Protect occupants during emergencies with this In the Event of Fire Do Not Use Lift sign, a mandatory safety requirement under AS 1319 for multi-storey buildings, offices, and public venues. Clear, compliant messaging directs people to stairs and away from lift shafts during fire evacuation. Available in corflute, polypropylene, colorbond, and vinyl, sized from 225×300 mm to 600×900 mm. Reflective finishes improve visibility in smoke-affected conditions. Bulk orders for building compliance programmes receive trade pricing and expedited delivery across Australia.

Final sign type, wording, size, placement and material depend on the site risk, project specification and applicable jurisdiction. Confirm the requirement with the relevant WHS adviser or regulator.

Category
Site Management Signs
Sign selection
Confirm against site requirements
Artwork
Off-the-shelf design supplied as shown
Product code
PSS-WH-GEN-0055

Available materials

MaterialSpecification

Available sizes

    Frequently asked

    Is this sign mandatory for all buildings with lifts?

    The appropriate safety-sign category, wording, placement and supporting controls depend on the product purpose, site risk and applicable jurisdiction. Confirm the requirement with your WHS adviser or regulator; a sign alone does not discharge WHS duties.

    Where exactly should the sign be mounted?

    Mount on or immediately adjacent to the lift doors at eye level, and at stairwell entry points on each floor to reinforce the message during evacuation drills and emergencies.

    Do reflective finishes help in smoke-filled conditions?

    Reflective grades provide different visibility performance. Choose the grade required by the project specification and site conditions, and confirm any road, traffic or high-risk requirement with the relevant authority before ordering.

    Can I order signs for a whole building at once?

    Absolutely. Provide your floor plan and lift locations, and we'll calculate quantities, deliver a bulk quote, and arrange staged or single delivery to suit your project timeline.

    How often should these signs be replaced?

    Inspect annually as part of your fire safety audit. Replace if print fades, material yellows, or lamination peels. We can supply replacement batches quickly for planned maintenance cycles.

    Platinum Signs · Product data sheethttps://www.platinumsigns.com.au · PSS-WH-GEN-0055